Facility Management
Facility management encompasses the physical environment in which testing occurs. It involves the strategic design of the laboratory workspace, the management of essential utilities (power, water, HVAC), and the maintenance of a safe, ergonomic, and compliant infrastructure. A well-designed facility optimizes workflow (Lean principles), minimizes the risk of biohazard exposure, and ensures that sensitive instrumentation functions within manufacturer specifications
Laboratory Design & Workflow
The layout of a Hematology laboratory is rarely static. It must evolve to accommodate new automation lines and changing test volumes. Modern design prioritizes “Open Laboratory” concepts and Lean workflow
Spatial Arrangement
- The Open Lab Concept: Historically, labs were divided into separate rooms (Hematology room, Chemistry room). Modern design removes these walls to create a large open hall. This allows for shared staffing (one laboratory scientist can monitor both Chem and Heme analyzers during night shift) and better visibility
-
Workflow Patterns: Design should follow the path of the specimen to minimize “travel distance.”
- Linear Workflow: Specimen Receiving \(\rightarrow\) Processing/Centrifugation \(\rightarrow\) Analyzer Loading \(\rightarrow\) Storage/Disposal. This prevents the “Spaghetti Diagram” effect where staff cross paths unnecessarily, increasing the risk of collisions and spills
- Flexibility: Workbenches should be modular and movable (on wheels) rather than fixed to the wall. Utilities (power/data) should drop from the ceiling rather than be hardwired into the floor. This allows the lab to reconfigure the layout when a new analyzer arrives without major construction
Ergonomics & Safety Design
- Adjustable Stations: Microscopy stations should have adjustable tables and chairs to prevent musculoskeletal strain during prolonged differential counting
- Noise Control: Hematology analyzers (with their pneumatics and compressors) and centrifuges are loud. Design should include sound-dampening ceiling tiles or separate alcoves for noisy compressors to keep decibel levels safe (\(< 85 \text{ dBA}\))
- Eye Wash Stations: Must be located within 10 seconds (approx. 55 feet) of hazard areas (e.g., the staining sink or acid storage). They must be unobstructed and require only a single motion to activate
Utilities & Infrastructure
Hematology analyzers are sophisticated computers combined with fluidics systems. They rely heavily on the stability of the facility’s utilities. Infrastructure failure is a common cause of “Analyzer Error” flags
Electrical Power
- Conditioned Power: Analyzers are sensitive to voltage spikes (“dirty power”). Dedicated circuits with Line Conditioners are often required to smooth out fluctuations that could fry circuit boards or corrupt data
- Uninterruptible Power Supply (UPS): A battery backup system that bridges the gap between a power outage and the generator kicking in. This prevents the analyzer from crashing mid-cycle, which could ruin the reagents in the lines or lose patient data
- Emergency Power: The lab must have red outlets connected to the hospital’s backup generator. Critical equipment (refrigerators, LIS servers, and at least one analyzer) must be plugged into these outlets
HVAC (Heating, Ventilation, & Air Conditioning)
- Temperature Control: Reagents and Analyzers have strict operating temperature ranges (typically \(18-30^\circ\text{C}\)). If the AC fails and the room gets too hot, enzyme kinetics (in Coagulation) speed up, and reagents degrade. The lab must monitor room temperature continuously
-
Ventilation
- Air Exchange: Labs require high air exchange rates (e.g., 6–12 changes per hour) to dilute fumes and odors
- Pressure: The laboratory should generally be under Negative Pressure relative to the hallway (air flows into the lab when the door opens, not out). This prevents bioaerosols or chemical fumes from escaping into public areas
- Fume Hoods: Required for tasks involving volatile chemicals (e.g., Xylene used in bone marrow processing). The face velocity of the hood must be verified annually
Water Quality
Automated analyzers consume massive amounts of water to rinse probes and dilute reagents. Tap water is full of ions (calcium, magnesium) and bacteria that interfere with testing
-
Clinical Laboratory Reagent Water (CLRW): The facility must have a central water purification system (Reverse Osmosis + Deionization)
- Resistivity: Must be \(> 10 \text{ M}\Omega\cdot\text{cm}\) (measure of ionic purity). Low resistivity indicates the deionizer filters are exhausted
- Microbial Content: Must be low (\(< 10 \text{ CFU/mL}\)) to prevent bacterial growth in the analyzer tubing, which causes high background counts
Storage & Space Management
Space is the most expensive resource in a hospital. Efficient storage design is critical for inventory management
-
Cold Storage
- Refrigerators (\(2-8^\circ\text{C}\)): Essential for storing reagents (thromboplastin), controls, and patient samples. They must be commercial grade (no auto-defrost cycles which cause temperature spikes)
- Freezers (\(-20^\circ\text{C}\) and \(-70^\circ\text{C}\)): Required for storing Coagulation Factor assays and reference plasma
- Monitoring: All cold storage must be monitored 24/7 by a digital alarm system (e.g., Rees or Tutela) that alerts staff if the temperature drifts out of range
- Flammables Storage: Alcohol and stain fixatives (methanol) are highly flammable. They must be stored in yellow, metal “Flammable Safety Cabinets” that are vented and grounded to prevent static discharge. The volume of flammables allowed outside the cabinet is strictly limited by fire code
Waste Management Infrastructure
The facility must be designed to handle the safe removal of hazardous waste generated by Hematology
- Liquid Waste (Drain Disposal): Some analyzer waste (saline/blood mixture) can be flushed down the drain if the facility has a neutralizing tank or if local municipal codes allow it. However, waste containing Cyanide (used in some Hgb methods) or Azide cannot go down the drain
- Solid Biohazard Waste: Red bag waste requires designated storage areas that are secure (locked) until Environmental Services removes them
- Sharps Disposal: Wall-mounted sharps containers must be placed at every phlebotomy station and workbench where slides are made (glass hazard) to prevent needle-stick injuries